Our VisionWhat we're proposing:We are proposing the following:
A suitable initial configuration for the new bridge could be:
![]() Transforming Auckland:Our vision goes well beyond connectivity: it’s about transforming Auckland as a place to live and to visit. It’s about wiping the slate clean and asking: “What would be the best outcome for Auckland and New Zealand? How can we do this once, and do it right?” Click here to learn more about the transformational benefits of the new bridge. Construction time-frame:We propose that construction of the new bridge be under way in time to commemorate ANZAC Day Centenary celebrations in 2015. International consulting firms advise that such a bridge could be constructed in four years.Gallery:Click here to see what the new bridge could look like. Click here to see an interactive 3D visualisation of the proposed new bridgeOther features:What else would be possible with a bridge? Click here to see |



ANZAC Centenary Bridge pre-feasibility study